Additional sum of money allowed for items of work, normally used where the work has become slightly different from that agreed or described in the contract documents.
What does extra mean in construction?
Extras
| Term | Definition |
|---|---|
| Extras | Additional work requested of a contractor, not included in the original plan, which will be billed separately and will not alter the original contract amount, but increase the cost of building the home. |
What does item mean in BoQ?
The unit given as “ items” in the BOQ means such items should be carried out by the Contractor as a lump sum item.
What is extra work?
Extra work is work falling outside the scope of the agreed upon services, often referred to as ‘scope creeping’. It is also work that should be paid for seperately and is usually charged afterwards. Extra work and additional work are often used interchangebly, but are in fact two different things.
What is a firm bill of quantities?
A bill of quantities (BoQ) is a document prepared by a cost consultant that provides project-specific measured quantities of the items of work identified by the drawings and specifications in the tender documentation.
What are spot items?
The term ‘spot items’ refers to items of existing buildings that require alteration and repair. In order for quantity surveyors to be able to price spot items, they need to be inspected on site to gain an understanding of the extent of work that will be involved.
What you mean by extra work?
Extra work is something that is done in addition to the requirements of the contract. Materials and labor not contemplated by the contract and which are required by subsequent changes in the plans and specifications are assumed as extra work. This is also termed as additional work.”
What is the difference between extra work and additional work?
What’s the difference between “extra work” and “additional work” in a construction contract? Extra work is work arising outside of and independent of the contract, something not required in its performance. Additional work is required in the performance of the contract and without which it could not be carried out[1].
What is difference between BOQ and BOM?
While BOM is related to the list of inventory, including raw materials, parts, components, etc., BOQ lists the total number of materials required to complete a project. BOQs help project developers in getting detailed quotes for project requirements and BOM give a clarity on what all is needed for completion.
What is the purpose of BOQ?
Importance of BOQ It facilitates all contractors tendering for a contract to price on precisely for the same information. By providing the quantities to tenderers, bill of quantities gives a basic idea of the project. BOQ describes the scope of the work to be completed.
What is the difference between extra and additional?
“Extra” and “Additional” are roughly the same thing, however it is more the context in which they are spoken. “Extra” is an informal word and would be used in casual language. Example: “I want extra cheese on my sandwich.” “Additional” is a formal word and would be used more in a business setting.
What is included in a bill of quantities?
A bill of quantities is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized. Preparing a bill of quantities requires that the design is complete and a specification has been prepared.
What is query sheet?
Query sheets provide a formal record of questions that have been asked and answers given and should also record who asked each question, and when, and who answered each question, and when.
Does extra work synonym?
Synonyms for extra work in English additional job; extra work; additional task; overtime; additional work; overwork; sideline.
What is extra work agreement?
Additional work is the work done under the terms of contract whereas, extra work is the work which is outside the terms of contract. Additional work usually comes within the terms of contract and therefore it does not amount to additional payment.
What is meant by BOM?
A bill of materials (BOM) is a centralized source of information used to manufacture a product. It is a list of the items needed to create a product as well as the instructions on how to assemble that product. Manufacturers that build products start the assembly process by creating a BOM.
How do you explain a bill of quantities?
A bill of quantities (commonly known as BOQ or BQ) is a document prepared by a quantity surveyor or cost consultant to define the quality and quantity of works required to be carried out by the main contractor to complete a project.
What is the synonym of additional?
In this page you can discover 25 synonyms, antonyms, idiomatic expressions, and related words for additional, like: further, extra, another, increase, more, added, necessary, other, new, supplementary and auxiliary.
When would you use a bill of quantities?
The prime purpose of the Bill of Quantities (BQ) is to enable all contractors tendering for a contract to price on exactly the same information. Subsequent to this, it is widely used for post-tender work such as: material scheduling; construction planning; cost analysis; and cost planning.